Prime Buildings & Developments
sage green kitchen with island and herringbone floor

Kitchen Installationin NorthamptonSupply-and-Fit or Install-Only

Your new kitchen fitted by a building team, so walls, drainage and the fit are handled together, not by three separate firms.

Service overview

What kitchens involve

What it is

We install complete kitchens on a supply-and-fit basis, or install-only where you provide the cabinetry and appliances.

Who it’s for

It is for Northampton homeowners replacing a kitchen, fitting one in a new extension, or reconfiguring the room as part of a renovation.

When you need it

It makes sense when your current kitchen is worn out, doesn’t suit your needs, or when you’re extending or knocking through.

Why it needs a professional

A kitchen fit often involves building work: removing walls, moving drainage and services. A building team handles all of it.

Get it wrong and it costs you

What happens when kitchens are rushed or done cheaply

Uneven walls and floors

Units fitted to out-of-true walls without correction look poor and doors won’t align.

Drainage problems

Moving sinks and appliances without planning drainage leads to leaks.

Coordination delays

Separate builders and fitters waiting on each other adds weeks.

Cost surprises

Building work hidden behind a kitchen quote raises costs.

Common mistakes homeowners make

  • Ordering units before the room is finalised.
  • Hiring a fitter for work that needs a builder.
  • Ignoring drainage when changing the layout.

Our process

Five clear steps, start to handover

  1. 01

    Initial enquiry & consultation

    We talk through your requirements, plans, drawings or ideas, so we understand what you want the finished space to do.

  2. 02

    Survey & quantity surveyor estimate

    We assess the site, then a professional quantity surveyor prepares your estimate from the real scope. It is free for standard projects; on rare, unusually complex schemes a detailed estimate is £250 including VAT, and we tell you before any work on it starts.

  3. 03

    Pre-commencement

    Your start date is fixed and the work is scheduled. The first payment is due 72 hours before we start on site, not weeks in advance.

  4. 04

    Staged construction

    The work is delivered in 4 to 7 clearly defined physical stages, such as concrete footings, brickwork to roof plate, watertight roof and plasterboard complete. Each stage is invoiced only once you can see it done.

  5. 05

    Practical completion

    Final inspection, Building Control sign-off where applicable, handover, and a small remaining balance settled on completion.

Why homeowners choose Prime

What you get when we build your kitchen

Honest pricing

We give estimates, not ‘fixed quotes’ that grow later. A quantity surveyor builds the figure from the real scope of your home.

You pay for what you can see

Between 4 and 7 stage payments, each tied to a visible milestone. You are never paying far ahead of the work.

One team, every trade

Groundworks, steel, brickwork, joinery and finishes are handled by one team, so nothing falls between separate contractors.

Structural work done to calculation

Steelwork follows engineer’s calculations, from our partner local structural engineering firm or your own engineer.

Cover if something goes wrong

£5,000,000 public liability insurance, employers’ liability for all on-site personnel, and an optional insurance-backed guarantee at 15% of the final project cost.

You always know what’s next

Rick stays in contact from the first visit to handover. Reviewers repeatedly mention clear day-to-day updates and tidy, considerate sites.

In detail

Kitchens in Northampton: methods and options

We work on homes only, never commercial property, across Northampton and the surrounding Northamptonshire towns and villages.

Supply-and-fit

+

We supply and fit the complete kitchen, so one team is responsible for the units, the building work around them and the installation. It removes the gap between the kitchen company and the builder where problems usually start.

Install-only

+

If you’ve already chosen and bought your cabinetry and appliances, we fit them. You keep control of the design and supplier, and we handle preparing walls and floors, the installation and any building work the layout needs.

Kitchens in extensions

+

When the kitchen is going into a new extension, we build the room and fit the kitchen as one project. Drainage, services and wall positions are planned around the kitchen layout from the start rather than adjusted afterwards.

Knock-throughs for open-plan kitchens

+

Many kitchen projects start with removing a wall between the kitchen and dining room. Load-bearing walls are removed with engineer-specified steel, and Building Control sign-off forms part of completion where applicable.

Drainage and services

+

Moving a sink, dishwasher or washing machine means moving the waste. New layouts get properly laid drainage before floors and units go in, so there are no leaks hidden behind your new kitchen.

Related services

Areas we cover

Our work

Recent kitchens projects

farmhouse kitchen under exposed beamsfarmhouse kitchen with vaulted ceilingshaker kitchen with built-in ovenskitchen with range cooker and brick chimneycountry kitchen with oak beamhandleless kitchen with islandwhite kitchen with tall ovensconcrete-effect kitchen with built-in ovenswhite kitchen with black worktops
View building projects in Northamptonshire →

Before you start

Planning, regulations and living at home during kitchens

How your estimate for kitchens is put together

+

We don’t publish package prices, because no two homes are the same: the age of the house, the ground it sits on, where the drains run, what is hidden in the walls and the finish you want all change the cost. Instead, after a site survey, a professional quantity surveyor prepares your estimate from the real scope of work. That means labour, materials, structural elements and the order of work are all accounted for before you agree anything. For most projects this estimate is free, because we pay for the quantity surveyor’s time. Only for unusually large or complex schemes is a detailed estimate charged, at £250 including VAT, and we always tell you before any work on it starts.

We use the word “estimate” deliberately. Existing homes often reveal things once they are opened up, and pretending otherwise with a “fixed price” usually means the number either hides gaps or carries a large margin for risk. When something does change, we talk about it openly with you and agree the way forward together before carrying on.

What a stage payment looks like

+

Your project is divided into 4 to 7 milestones depending on its size and value. Typical examples are concrete footings complete, brickwork up to roof plate, roof covering watertight and plasterboard complete. Each milestone is something you can walk out and see for yourself. Only then is that stage invoiced. The first payment falls 72 hours before we start on site, and a small remaining balance is settled at practical completion and handover, so you are never paying far ahead of the work in front of you.

Planning permission and permitted development

+

Planning permission is about what a building looks like and how it affects its surroundings. Some residential work can be carried out under permitted development rights without a full planning application, while other projects need approval from the local council. Rules differ for conservation areas, listed buildings and homes where permitted development rights have been removed by an earlier condition. If you already have approved plans, we build to them. If you don’t, we’ll talk through the options at your first consultation.

Building Regulations are separate from planning

+

Even where planning permission isn’t needed, most structural and habitable work must meet Building Regulations. These cover structure, fire safety, insulation, ventilation and drainage. A Building Control inspector checks key stages, and on completion you receive the sign-off you’ll need when you come to sell or remortgage. Final inspection and Building Control sign-off, where applicable, are part of practical completion on every project we deliver.

The Party Wall Act

+

If your work involves a wall shared with a neighbour, building on the boundary, or digging foundations close to a neighbour’s property, the Party Wall etc. Act 1996 usually requires you to give them formal notice before work starts. It’s worth raising early, because notice periods need to run before that part of the work can begin.

Living at home while we work

+

Most of our customers stay in their homes throughout. Work is planned in stages so you know what is happening each week, who will be on site and what part of the house will be affected next. Reviewers regularly mention clear day-to-day updates and clean, considerate sites, the things that make living alongside a build manageable.

Questions to ask any builder

+
  • Who prepares the price, and what exactly does it include?
  • How much is due before work starts, and when are the stage payments?
  • What insurance do you hold, and is a guarantee available?
  • Who is my day-to-day contact, and how will I be kept updated?
  • Do you work to structural calculations and arrange Building Control?

We’re happy to answer every one of these before you commit. Read about Rick and the team, see verified reviews, or request your estimate.

Local to Northampton

+

We’re based at The Beren, Blisworth Hill Business Park, just south of Northampton, and carry out kitchens across the town and the surrounding villages, from Towcester, Roade and Bugbrooke to Moulton, Brixworth, Daventry and Wellingborough. Back to the homepage or browse all services.

FAQ

Kitchens questions, answered

Can I buy my own kitchen and have you fit it?

Yes, we offer install-only.

Can you supply the kitchen?

Yes, supply-and-fit is available.

Can you knock through at the same time?

Yes, with structural calculations and steel.

Is the estimate free?

Free for most projects, QS-prepared.

How much will it cost?

Every home is different, so we don’t publish package prices. A professional quantity surveyor prepares your estimate from the real scope. For most projects that estimate is free; only for unusually large or complex schemes is a detailed estimate charged at £250 including VAT, and we’ll always tell you first.

Why an estimate rather than a fixed quote?

Changes often come up once work begins on an existing home. A QS-prepared estimate reflects the real scope, so you get an honest figure rather than a low number that grows later.

How do the payments work?

The first payment is due 72 hours before we start. You then pay in 4 to 7 stages, each invoiced only when that stage is visibly complete, with a small final balance at handover.

Is the work guaranteed?

An insurance-backed guarantee is available as an option, at 15% of the final project cost. We also hold £5,000,000 public liability insurance and employers’ liability insurance.

Do you take on emergency call-outs?

We carry out planned residential building projects rather than emergency call-outs. If you have a concern about your property, call Rick on 07704 675073 to talk it through.

Know the real cost of your kitchen before you commit

Share the basics and Rick will call you to talk it through. Free QS-prepared estimate for most projects, no obligation.

FMB & Checkatrade members · £5M public liability · Pay only for stages you can see

CallEstimate